You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This feature is dedicated to the integration and refinement of the MPC. This includes resizing the MPC to fit the entire game, fixing the frames that are bugging also completing the buff integrations that were left from Sprint 3. The main focuses of this ticket are highlighted in the bullet points down below.
The main player seems to be needing a resize to fit the entire game.
Fixing the frames that need to be smoothed out, as well as the frames that required posture corrections.
The buff animations are required to be finalized so that it doesn't run into an error when multiple buffs are collected.
It is necessary to conduct a refinement action in order to provide users with the best gaming experience.
Sub Features & Components
The sub-features and components include the leftover tasks from Sprint 3.
Buff animation frames finalization.
Resizing MPC frames.
Smooth and correcting certain postures.
Examples
The MPC size should fit the game.
The MPC's buffed and debuffed animation should change smoothly without error.
Description
This feature is dedicated to the integration and refinement of the MPC. This includes resizing the MPC to fit the entire game, fixing the frames that are bugging also completing the buff integrations that were left from Sprint 3. The main focuses of this ticket are highlighted in the bullet points down below.
It is necessary to conduct a refinement action in order to provide users with the best gaming experience.
Sub Features & Components
The sub-features and components include the leftover tasks from Sprint 3.
Examples
Dependencies
Task Tickets
Milestones
Sprint 4 [06-10-2021 to 20-10-2021]
Finalization and refinement of the MPC.
Test and evaluation deadline (Oct. 18)
Members
The text was updated successfully, but these errors were encountered: