update concurrency #86
build_initial.yml
on: push
build-initial
/
build
6m 18s
Matrix: testDev
Matrix: testProd
Matrix: testIntegration
thank you, next
0s
Annotations
5 errors
testIntegration (1) / build
Canceling since a higher priority waiting request for 'refs/heads/ijjk/update-ci-workflow-build-initial' exists
|
testIntegration (3) / build
Canceling since a higher priority waiting request for 'refs/heads/ijjk/update-ci-workflow-build-initial' exists
|
testIntegration (5) / build
Canceling since a higher priority waiting request for 'refs/heads/ijjk/update-ci-workflow-build-initial' exists
|
testIntegration (4) / build
Canceling since a higher priority waiting request for 'refs/heads/ijjk/update-ci-workflow-build-initial' exists
|
testIntegration (4) / build
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
turbo run summary
Expired
|
6.6 MB |
|